Kenya
Industrial cooling and ventilation in Nairobi
Nairobi is the manufacturing and distribution hub of East Africa, and most of the plants that matter sit in a tight arc around the centre — the old Industrial Area off Lusaka Road, Baba Dogo and Ruaraka on the north side, Embakasi along Mombasa Road, and the export processing zones at Athi River. Food and beverage lines, plastics moulding, packaging printers, pharmaceutical rooms and apparel EPZ sheds all run long shifts under uninsulated metal roofs. Around the city, the Kiambu, Thika and Limuru poultry belt supplies much of the broiler and layer stock eaten in the country, and those houses need steady air change far more than they need chilled air. Ayzair serves both sides of that demand, from Hammer exhaust fans for poultry sheds to HVLS fans over warehouse floors.
Nairobi climate — the honest version
Nairobi sits at about 1,795 m, so hot season highs stay near 26–28 °C with humidity around 50 to 60 percent, which makes evaporative cooling useful for spot relief while ventilation and air movement matter more.
Cargo lands at Mombasa in 12 to 16 days from Nhava Sheva or Mundra, then moves about 480 km by road on the A109 to Nairobi, adding two to three days after clearance.
6families
Complete range supplied here
34models
Every model available to order
10–20days
Production lead time
24hrs
Sizing and quotation
The complete range
All six Ayzair families, supplied in Nairobi.
Every product we make is available in Nairobi. They are ordered by how well each one suits the local climate and the industries here, but nothing is off the list.
Where we supply
Industrial areas of Nairobi.
Who buys here
Industries in Nairobi.
- Food and beverage processing
- Poultry and agribusiness
- Apparel and textiles in the EPZ
- Plastics and packaging
- Pharmaceuticals
- Warehousing and distribution
Worth knowing locally
- Mains supply is 415 V three phase 50 Hz, and most plants in the Industrial Area run a diesel standby set, so fan and cooler motors are sized with that generator in mind.
- Imports need a KEBS pre-export verification of conformity certificate issued by the approved agent in India before shipment, so allow inspection time alongside the 10 to 20 working day build.
- For poultry buyers around Kiambu and Thika, a 300 by 40 ft tunnel house typically needs four to five 1400 mm Hammer fans to change the full air volume every minute.
Nairobi enquiry
Get a proforma invoice for Nairobi.
Tell us the building — area, roof height and what happens inside — or name the models and quantities you already know you need. You will get USD pricing, your Incoterm, a container loading plan and a confirmed lead time within one working day.
Export desk
Answers
Supplying Nairobi — common questions
Cannot find what you need? Call +91 80871 10156 or WhatsApp us — an engineer, not a call centre, picks up.
Ask on WhatsAppWhich Ayzair product suits a warehouse in Nairobi Industrial Area?
For a high roof warehouse the HVLS fan is the usual choice, because Nairobi is mild rather than hot and the real problem is stagnant air under the roof. A 24 ft fan covers up to 1,200 sq m at under 40 dB and draws a fraction of what banks of pedestal fans would consume.
How long does delivery to Nairobi take from India?
Manufacturing takes 10 to 20 working days at the Pune works, sea transit from Nhava Sheva to Mombasa is 12 to 16 days, and road haul to Nairobi adds two to three days plus clearance. Buyers who need a fixed date usually allow six to eight weeks door to door.
Do the exhaust fans suit poultry houses in Kiambu and Thika?
Yes. Hammer exhaust fans are built from 200 mm up to 1750 mm and reach 68,000 CMH, which covers what tunnel ventilated broiler and layer houses need. Fan count is worked out from house volume and target air change, and staged control keeps birds comfortable on cool highland nights.
Nearby
Also supplied across Kenya.
Next step
Shipping to Nairobi?
Send your requirement and we will confirm the freight route, transit time, landed cost and whether our equipment genuinely suits Nairobi conditions — before you commit to anything.





