Europe
Selective — see noteIndustrial cooling & ventilation for Iceland
Icelandic industry is concentrated in a short list of places: the fish processing, freezing and packing plants at Grindavík, Vestmannaeyjar, Akureyri and Reykjavík, the aluminium smelters at Grundartangi, Reyðarfjörður and Hafnarfjörður, geothermal and energy plant across the southwest, and warehousing and light manufacturing around Reykjavík and Hafnarfjörður. These are damp, salty, windy buildings with real process loads. Ayzair supplies Hammer wall exhaust fans in 15 sizes from 200 to 1750 mm, inline jet duct fans for ducted runs, and HVLS fans for the heated halls above 7 m clear.
Climate suitability — the honest version
Cool oceanic — 11–15 °C summer highs, high humidity and strong wind through the year
There is no cooling market in Iceland and we will not invent one. Summer highs of 11–15 °C in saturated Atlantic air leave absolutely nothing for an evaporative cooler to do. What Iceland needs is extraction — fish processing, rendering and smelter ancillary buildings all have process heat and moisture to remove — and destratification in the heated halls that are tall enough for it. We should also be straightforward about the second point: Iceland is a small and distant market. Transit is 35–45 days and almost always transhipped in Rotterdam, so this works for a planned order, not an urgent one.
Reykjavík
Primary destination port
35–45 days
Sea transit from India
10–20days
Production lead time
4terms
EXW · FOB · CIF · CFR
The complete range
All six Ayzair families, supplied to Iceland.
Every product we make is available in Iceland — thirty-four models across six families. They are ordered here by how well each one suits the local climate and the industries that dominate this market, but nothing is off the list.
Industries
Who buys from us in Iceland.
Logistics & compliance
Shipping to Iceland.
| Destination ports | Reykjavík · Hafnarfjörður · Grundartangi for project cargo |
| Sea transit | 35–45 days from Nhava Sheva, usually transhipped in Rotterdam |
| Incoterms | EXW · FOB · CIF · CFR |
| Container loading | 20 ft or LCL consolidation is normal for Iceland · HVLS fans ship knocked down |
| Production lead time | 10–20 working days |
- 230 V single-phase and 400 V three-phase at 50 Hz matches Icelandic supply directly.
- Transit is 35–45 days and sailings to Iceland are transhipped, usually through Rotterdam, with onward feeder services running to a weekly or fortnightly pattern. Order well ahead; there is no fast option from India.
- Salt air and wind are constant, not seasonal. Specify marine-treated hardware for anything on an external wall, and expect a shorter inspection interval than a mainland site.
- Our fans are CE marked to the Low Voltage and EMC Directives and ship with the declaration of conformity and technical file. Iceland applies the EEA regime, and anything your buyer needs beyond those two directives we supply as documentation for their own assessor to confirm.
Iceland enquiry
Get a proforma invoice for Iceland.
Tell us the models and quantities, or just describe the building and let us size it. You will receive USD pricing, your Incoterm, a container loading plan and a confirmed lead time — within one working day.
Export desk
Answers
Supplying Iceland — common questions
Cannot find what you need? Call +91 80871 10156 or WhatsApp us — an engineer, not a call centre, picks up.
Ask on WhatsAppIs it worth ordering from India for a single Icelandic plant?
Honestly, only if you are ordering a reasonable quantity and can plan ahead. Transit is 35–45 days with transhipment in Rotterdam, and for one or two wall fans the freight and handling will swamp the price advantage. For a plant-wide extraction package, or a fit-out you are specifying months in advance, the numbers work. We will tell you which case you are in when you send the list.
Do you supply evaporative coolers for Iceland?
No. Summer highs of 11–15 °C in air close to saturation mean an evaporative cooler would do nothing except add moisture. There is no version of this product that makes sense in an Icelandic building and we would rather say so than take an order we could not defend.
What do you recommend for a fish processing hall?
Extraction and air movement, specified for a wet and salty environment. Hammer wall exhaust fans up to 68,000 m³/h handle the bulk air change, with inline jet duct fans for local capture on ducted runs. Where the hall is heated and above 7 m clear, HVLS fans also pay back on the heating bill. Tell us which areas get washed down and how often, so we quote protected motors where they are needed rather than across the whole job.
Nearby markets
Also in Europe
Next step
Shipping to Iceland?
Send your requirement and we will confirm the freight route, transit time, landed cost and whether our products genuinely suit your climate — before you commit.





