Americas
Selective — see noteIndustrial cooling & ventilation for Guyana
The reason this page exists is the offshore oil build-out. Production from the Stabroek block has pulled a wave of construction, shore base, warehousing and fabrication work onto the Demerara and Essequibo coast — the shore bases and supply yards around Georgetown, Houston and Vreed-en-Hoop, new logistics sheds along the East Bank and East Coast Demerara corridors, and the workshops and yards that service all of it. Those are hot, humid, metal-roofed buildings going up quickly, and the air movement and extraction usually get specified late. Ayzair ships from Pune into Georgetown.
Climate suitability — the honest version
Humid tropical year round — 29–32 °C with 75–88% afternoon humidity and two wet seasons
Evaporative cooling is the wrong product for Guyana and we will not quote it. Afternoon humidity sits between 75% and 88% all year, which leaves effectively no wet-bulb depression to work with; a cooler would push the moisture content of an already saturated building higher and drop the temperature very little. What Guyana needs is air movement and extraction — hammer exhaust fans clearing heat out of workshops, warehouses and fabrication sheds, HVLS fans in the taller new distribution buildings, and mobile fans for spot cooling where men are working on a specific task.
Georgetown (Demerara River)
Primary destination port
35–45 days
Sea transit from India
10–20days
Production lead time
4terms
EXW · FOB · CIF · CFR
The complete range
All six Ayzair families, supplied to Guyana.
Every product we make is available in Guyana — thirty-four models across six families. They are ordered here by how well each one suits the local climate and the industries that dominate this market, but nothing is off the list.
Industries
Who buys from us in Guyana.
Logistics & compliance
Shipping to Guyana.
| Destination ports | Georgetown (Demerara River) |
| Sea transit | 35–45 days from Nhava Sheva, transhipped via Trinidad or Kingston |
| Incoterms | EXW · FOB · CIF · CFR |
| Container loading | 20 ft: up to 90 wall exhaust fans depending on size mix · 40 ft HQ: up to 24 crated HVLS fans |
| Production lead time | 10–20 working days |
- Guyana runs at 60 Hz, and this is the most important technical line here. A motor wound for 50 Hz turns roughly 20% faster on a 60 Hz supply — more airflow, but also more current drawn, a hotter motor, more noise, and bearings and impellers operating beyond the speed they were rated for, since fan absorbed power rises sharply with speed. We wind motors for 60 Hz when the order states 60 Hz, so say so on the enquiry. Voltage is less uniform: 110/220 V and 240 V single-phase both occur alongside three-phase supply, so confirm the voltage on site — a photograph of an existing nameplate is the quickest way to settle it.
- Georgetown is a river port on the Demerara with a draft limit, so sailings are feeder services transhipped at Trinidad or Kingston rather than direct from Asia. Expect 35–45 days and build clearance time on top. Equipment for a shore base or a construction programme should be ordered well ahead of the date it is needed on site.
- Coastal salt air, year-round humidity and heavy rain are all working on the equipment at once. Specify marine-grade finish and stainless fasteners, and keep motor terminations and electrical entries out of the weather — this is a climate where unprotected sheet steel and plated fixings do not last.
- HVLS fans need 7 m of clear height under the blade. The new distribution and shore base buildings often have it; older Georgetown workshops and sheds generally do not. Send us a roof height or a section and we will say which of the two approaches fits, rather than selling you a ceiling fan that cannot be hung properly.
Guyana enquiry
Get a proforma invoice for Guyana.
Tell us the models and quantities, or just describe the building and let us size it. You will receive USD pricing, your Incoterm, a container loading plan and a confirmed lead time — within one working day.
Export desk
Answers
Supplying Guyana — common questions
Cannot find what you need? Call +91 80871 10156 or WhatsApp us — an engineer, not a call centre, picks up.
Ask on WhatsAppWe are on 60 Hz. Will your fans run on it?
They will, but a 50 Hz machine should not simply be connected to it. On 60 Hz a 50 Hz motor runs about 20% faster: airflow rises, and so do current draw, motor temperature and noise, with bearings and impeller running above their rated speed. State 60 Hz on the order and we wind the motor for 60 Hz, which is how this market should be supplied.
Would evaporative coolers help in a Georgetown warehouse?
No, and we would rather tell you now. At 75% to 88% afternoon humidity there is almost nothing for the water to evaporate into, so the temperature drop is small and the building gets damper. For a Georgetown warehouse or workshop we quote hammer exhaust fans sized to the roof heat, HVLS fans if the clear height reaches 7 m, and the Model 1500 mobile fan at 38,000 m³/h on 370 W for spot cooling on a work front.
Can you supply quickly for an oil-sector construction programme?
Sea freight to Georgetown is 35–45 days and transhipped, so the only way to hit a construction date is to order against the programme rather than against the day the building is finished. Tell us the dates and we will be honest about whether a sailing works. Small quantities of spares and pads can go by air when something has been overlooked.
Next step
Shipping to Guyana?
Send your requirement and we will confirm the freight route, transit time, landed cost and whether our products genuinely suit your climate — before you commit.





