Selective — see noteIndustrial cooling & ventilation for Switzerland
Swiss manufacturing sits in tall, well-built halls that are heated hard and metered carefully — the pharma and fine-chemical plants around Basel and in the Valais at Visp, the machine-tool and machinery works at Winterthur, Zürich and Aarau, and the precision and watch workshops through Biel/Bienne and the Jura arc. Ayzair supplies HVLS fans for the heating-season saving and Hammer extract fans where a process needs air pulled out rather than mixed.
Climate suitability — the honest version
Cold winters, often well below 0 °C on the plateau; short summers reaching 33–36 °C
Switzerland spends five to six months heating its buildings, so evaporative cooling is the wrong product and we will not quote it. The destratification case is unusually strong here because Swiss energy is expensive: the warm layer trapped under the roof of a heated 10–12 m hall is paid-for energy doing no work, and an HVLS fan drawing 0.8–1.5 kW brings it back down.
Rotterdam or Antwerp with Rhine barge to Basel
Primary destination port
22–30 days to Rotterdam plus Rhine leg · 16–24 days to Genoa plus overland
Sea transit from India
10–20days
Production lead time
5terms
EXW · FOB · CIF · CFR · DDP on request
The complete range
All six Ayzair families, supplied to Switzerland.
Every product we make is available in Switzerland — thirty-four models across six families. They are ordered here by how well each one suits the local climate and the industries that dominate this market, but nothing is off the list.
Industries
Who buys from us in Switzerland.
Logistics & compliance
Shipping to Switzerland.
| Destination ports | Rotterdam or Antwerp with Rhine barge to Basel · Genoa for southern routing |
| Sea transit | 22–30 days to Rotterdam plus Rhine leg · 16–24 days to Genoa plus overland |
| Incoterms | EXW · FOB · CIF · CFR · DDP on request |
| Container loading | HVLS fans ship knocked down — 20 ft: up to 6 at 24 ft · 40 ft HQ: up to 14 |
| Production lead time | 10–20 working days |
- Switzerland is not in the EU, so customs clearance is separate from any EU entry — the goods clear into free circulation at the Swiss border, not at Rotterdam or Genoa. Budget for Swiss import formalities and VAT separately and have your forwarder confirm the tariff position before shipment.
- 230 V single-phase and 400 V three-phase at 50 Hz matches Swiss supply directly.
- Our fans carry CE marking to the Low Voltage and EMC Directives and ship with the declaration of conformity and technical file. Swiss product requirements closely track the EU directives but they are a separate legal regime, so let your importer confirm what applies to your installation rather than relying on the CE mark alone.
Switzerland enquiry
Get a proforma invoice for Switzerland.
Tell us the models and quantities, or just describe the building and let us size it. You will receive USD pricing, your Incoterm, a container loading plan and a confirmed lead time — within one working day.
Export desk
Answers
Supplying Switzerland — common questions
Cannot find what you need? Call +91 80871 10156 or WhatsApp us — an engineer, not a call centre, picks up.
Ask on WhatsAppDoes Switzerland accept the CE marking on imported fans?
Swiss technical requirements are largely aligned with the corresponding EU directives, and our fans are CE marked to the Low Voltage and EMC Directives with the declaration of conformity and technical file supplied. Switzerland is nonetheless a separate jurisdiction, so we hand the documentation to your importer and let them confirm it against current Swiss rules rather than claiming an approval we do not hold.
Why not evaporative cooling for the summer weeks?
The hot season is short, Swiss summer afternoons on the plateau are not reliably dry, and the building spends the rest of the year being heated. Adding a water-fed cooling system that idles for ten months is poor value. HVLS fans give an airspeed benefit of two or three perceived degrees in July and earn their keep in January.
How is the heating saving measured in a Swiss hall?
By the vertical temperature profile. Put loggers at floor, mid-height and just below the roof deck for a week in the heating season — a 12 m hall usually shows 10–14 °C between top and bottom. That gradient is the recoverable part. Running HVLS fans slowly and continuously typically returns 20–30% of heating energy, and at Swiss energy prices that is normally the whole business case.
Nearby markets
Also in Europe
Next step
Shipping to Switzerland?
Send your requirement and we will confirm the freight route, transit time, landed cost and whether our products genuinely suit your climate — before you commit.