Skip to content
Ayzair

Africa

Excellent fit

Industrial cooling & ventilation for Chad

Chad’s activity centres on N’Djamena, the Doba oilfields and the pipeline infrastructure running to the Cameroonian coast, and Moundou in the Logone where the cotton ginneries and the brewery are. Sarh and Abéché add some agro-processing. The buildings that matter for cooling are camp accommodation, workshops, ginnery halls and warehouses, all of them working through 42 °C afternoons with very dry air.

Climate suitability — the honest version

40–44 °C March–June highs with 10–20% afternoon humidity outside the short July–September rains

The Chadian Sahel is among the hottest dry environments anywhere, and evaporative cooling performs at close to its physical limit there through the long dry season. We will be straight about the rest: the industrial base is very small, the country is landlocked, and the usual route is Douala with roughly 1,800 km of road to N’Djamena. What we realistically serve is oilfield camps and workshops around Doba, cotton ginning and breweries at Moundou, food processing and cold-store support, livestock and poultry sheds, and warehousing.

Via Douala, then road to N’Djamena

Primary destination port

28–38 days to Douala, plus 10–18 days overland

Sea transit from India

10–20days

Production lead time

4terms

EXW · FOB · CIF · CFR

The complete range

All six Ayzair families, supplied to Chad.

Every product we make is available in Chad — thirty-four models across six families. They are ordered here by how well each one suits the local climate and the industries that dominate this market, but nothing is off the list.

Industrial Duct Air Coolers for Chad
Best fit here

Duct air coolers for factories and warehouses

A complete range of industrial duct air coolers - ductable evaporative units that pull fresh outside air, filter and cool it, then push it through ducting to exactly the parts of a factory, warehouse or commercial floor where people actually work.

30,000 CMH1.5–3 kW80–95 %
Industrial Mobile Fan — Model 1500 for Chad
Strong second

Model 1500 Heavy-Duty Industrial Mobile Fan

A 1.5-metre heavy-duty mobile fan that pushes 38,000 m³/h of directed airflow while drawing just 370 watts — roll it exactly where the heat is.

38,000 m³/h370 W1.5 m
Heavy Hammer Exhaust Fans for Chad
Also specified

Heavy Hammer Exhaust Fans — Industrial Ventilation

A high-capacity industrial ventilation system designed to expel large volumes of air efficiently — trusted across poultry farms, greenhouses, factories and warehouses.

68,000 m³/h151750 mm
Industrial HVLS Ceiling Fans for Chad
Also supplied

HVLS Large Ceiling Fans — DC Energy Saving / AS Series

HVLS (High Volume, Low Speed) fans move massive volumes of air gently across large indoor spaces. One Ayzair fan replaces 10–20 small high-speed fans — cutting energy use by up to 70%.

70 %5–8 °C1,200 m²
Industrial Portable Air Coolers for Chad
Also supplied

AYZAIR TENT-150 Industrial Portable Air Cooler

A 150-litre portable evaporative cooler on castor wheels — 16,000 CMH of cooled fresh air covering 1,000 sq ft, on just 500 watts of single-phase power.

16,000 CMH1,000 sq ft150 L
Inline Duct Fans — Mixed Flow for Chad
Also supplied

Inline Duct Fans — Mixed Flow, Ø100 to Ø315

Precision-engineered inline duct fans in high-strength PP — mixed-flow impellers delivering up to 2,300 m³/h and 700 Pa of static pressure across five duct sizes.

052300 m³/h700 Pa

Industries

Who buys from us in Chad.

Oil field services & camps
Cotton ginning
Breweries & beverages
Livestock & poultry
Food processing & cold stores
Warehousing & corridor logistics

Logistics & compliance

Shipping to Chad.

Destination portsVia Douala, then road to N’Djamena
Sea transit28–38 days to Douala, plus 10–18 days overland
IncotermsEXW · FOB · CIF · CFR
Container loading20 ft: up to 28 coolers · 40 ft HQ: up to 60 coolers
Production lead time10–20 working days
  • 220 V / 380 V at 50 Hz matches Chadian supply.
  • The Douala–N’Djamena corridor is long, seasonal and the single biggest cost and timing risk on any Chad shipment. We quote CIF Douala; your forwarder prices and schedules the overland leg, and the rainy season affects it.
  • Water consumption of 40–70 litres an hour per ducted unit needs checking against site supply, which in much of Chad is borehole or trucked.
  • Grid supply outside N’Djamena is limited, so most sites run generators. A cooler at 1.5–3 kW and a mobile fan at 370 W are modest loads that fit that reality.

Chad enquiry

Get a proforma invoice for Chad.

Tell us the models and quantities, or just describe the building and let us size it. You will receive USD pricing, your Incoterm, a container loading plan and a confirmed lead time — within one working day.

Or WhatsApp instantly

We respond within one working day. Your details are used only to prepare your quotation.

Answers

Supplying Chad — common questions

Cannot find what you need? Call +91 80871 10156 or WhatsApp us — an engineer, not a call centre, picks up.

Ask on WhatsApp
Is the climate suitable for evaporative cooling?

Very much so for eight to nine months of the year. During the July–September rains humidity rises and the drop you get falls away, so sites needing year-round comfort should plan on fans as well as coolers.

What is realistic on lead time to N’Djamena?

Manufacture plus 28–38 days sea to Douala plus 10–18 days overland, and the overland leg is the uncertain part. We would rather quote you that range honestly than promise a date we cannot control.

Next step

Shipping to Chad?

Send your requirement and we will confirm the freight route, transit time, landed cost and whether our products genuinely suit your climate — before you commit.

Call nowGet a quote