Skip to content
Ayzair

Caribbean & Central America

Selective — see note

Industrial cooling & ventilation for Saint Vincent and the Grenadines

Kingstown and the deep water berth there handle almost all the country’s cargo, with the flour and rice milling, brewing and bottling, and agricultural packing clustered around the capital and at Campden Park. The Grenadines — Bequia, Mustique, Union Island — run yachting, marine services and resort back-of-house that need extraction rather than cooling. Ayzair supplies hammer wall exhaust fans, inline duct fans and Model 1500 mobile fans into that building stock, which is almost entirely single-storey.

Climate suitability — the honest version

29–31 °C year round with 75–85% afternoon humidity and a wet season June–December; the windward side is wetter again, with no dry month

Evaporative cooling is the wrong product for Saint Vincent and the Grenadines. Afternoon humidity sits between the mid-seventies and mid-eighties all year and a cooler has no wet-bulb depression to convert into cooling. There is no manufacturing base worth the name — a flour mill, a rice mill, arrowroot and agricultural packing, fish handling, brewing and bottling, and the yachting and resort trade through the Grenadines. For that stock the right equipment is hammer wall exhaust fans, inline duct fans and mobile fans, in quantities of ones and twos rather than plant installations.

Kingstown

Primary destination port

40–45 days

Sea transit from India

10–20days

Production lead time

4terms

EXW · FOB · CIF · CFR

The complete range

All six Ayzair families, supplied to Saint Vincent and the Grenadines.

Every product we make is available in Saint Vincent and the Grenadines — thirty-four models across six families. They are ordered here by how well each one suits the local climate and the industries that dominate this market, but nothing is off the list.

Heavy Hammer Exhaust Fans for Saint Vincent and the Grenadines
Best fit here

Heavy Hammer Exhaust Fans — Industrial Ventilation

A high-capacity industrial ventilation system designed to expel large volumes of air efficiently — trusted across poultry farms, greenhouses, factories and warehouses.

68,000 m³/h151750 mm
Inline Duct Fans — Mixed Flow for Saint Vincent and the Grenadines
Strong second

Inline Duct Fans — Mixed Flow, Ø100 to Ø315

Precision-engineered inline duct fans in high-strength PP — mixed-flow impellers delivering up to 2,300 m³/h and 700 Pa of static pressure across five duct sizes.

052300 m³/h700 Pa
Industrial Mobile Fan — Model 1500 for Saint Vincent and the Grenadines
Also specified

Model 1500 Heavy-Duty Industrial Mobile Fan

A 1.5-metre heavy-duty mobile fan that pushes 38,000 m³/h of directed airflow while drawing just 370 watts — roll it exactly where the heat is.

38,000 m³/h370 W1.5 m
Industrial Duct Air Coolers for Saint Vincent and the Grenadines
Also supplied

Duct air coolers for factories and warehouses

A complete range of industrial duct air coolers - ductable evaporative units that pull fresh outside air, filter and cool it, then push it through ducting to exactly the parts of a factory, warehouse or commercial floor where people actually work.

30,000 CMH1.5–3 kW80–95 %
Industrial HVLS Ceiling Fans for Saint Vincent and the Grenadines
Also supplied

HVLS Large Ceiling Fans — DC Energy Saving / AS Series

HVLS (High Volume, Low Speed) fans move massive volumes of air gently across large indoor spaces. One Ayzair fan replaces 10–20 small high-speed fans — cutting energy use by up to 70%.

70 %5–8 °C1,200 m²
Industrial Portable Air Coolers for Saint Vincent and the Grenadines
Also supplied

AYZAIR TENT-150 Industrial Portable Air Cooler

A 150-litre portable evaporative cooler on castor wheels — 16,000 CMH of cooled fresh air covering 1,000 sq ft, on just 500 watts of single-phase power.

16,000 CMH1,000 sq ft150 L

Industries

Who buys from us in Saint Vincent and the Grenadines.

Flour & rice milling
Agricultural packing & arrowroot processing
Brewing & bottling
Fish handling
Tourism & yachting back-of-house
Port warehousing & small workshops

Logistics & compliance

Shipping to Saint Vincent and the Grenadines.

Destination portsKingstown
Sea transit40–45 days from Nhava Sheva, feeder-served after transhipment at Port of Spain, Caucedo or Kingston
IncotermsEXW · FOB · CIF · CFR
Container loadingSaint Vincent orders ship LCL groupage almost without exception · Port of Spain is a common feeder origin
Production lead time10–20 working days
  • Saint Vincent and the Grenadines runs 230 V at 50 Hz, which is our standard motor build — no rewind and a shorter lead time than for the 60 Hz islands in the Leewards. Confirm the three-phase voltage at the board and we will wire to it.
  • Onward delivery to Bequia, Mustique or Union Island is by inter-island boat from Kingstown and is arranged locally. Factor that leg and its handling into your own programme; we deliver to Kingstown and your agent takes it from there.
  • Hurricane season runs June to November and the island sits in the track, with the added complication that La Soufrière is an active volcano. Shipping windows tighten in those months and wall-mounted exhaust fans on exposed elevations should be specified with fixings and shutters for the exposure they will face.

Saint Vincent and the Grenadines enquiry

Get a proforma invoice for Saint Vincent and the Grenadines.

Tell us the models and quantities, or just describe the building and let us size it. You will receive USD pricing, your Incoterm, a container loading plan and a confirmed lead time — within one working day.

Or WhatsApp instantly

We respond within one working day. Your details are used only to prepare your quotation.

Answers

Supplying Saint Vincent and the Grenadines — common questions

Cannot find what you need? Call +91 80871 10156 or WhatsApp us — an engineer, not a call centre, picks up.

Ask on WhatsApp
Can you ship to Bequia or Union Island directly?

No. Everything comes in through Kingstown and the onward leg to the Grenadines is an inter-island boat movement arranged by your agent on the island. We will deliver to Kingstown on CIF terms and tell you the crate dimensions and weights in advance so the onward handling can be booked properly. It is worth allowing a week for that leg.

Would an evaporative cooler help in a packing shed at Campden Park?

No. Afternoon humidity here runs into the eighties and evaporative cooling needs dry air to produce any useful temperature drop. In a packing shed you would be adding moisture to produce you are trying to keep dry. Hammer wall exhaust fans pulling air through the shed, with make-up air on the opposite side, are the right equipment and cost much less to run.

Next step

Shipping to Saint Vincent and the Grenadines?

Send your requirement and we will confirm the freight route, transit time, landed cost and whether our products genuinely suit your climate — before you commit.

Call nowGet a quote