Africa
Selective — see noteIndustrial cooling & ventilation for Ghana
Ghana’s industry runs through the Tema Free Zone and Heavy Industrial Area, the Spintex Road and North Industrial Area corridors in Accra, the food and timber plants around Kumasi, and the oil-services yards at Takoradi. Most of these are steel-portal sheds under metal roofing where the roof skin radiates heat down onto the floor all afternoon. Ayzair supplies HVLS fans and 200–1750 mm hammer exhaust fans sized for those buildings.
Climate suitability — the honest version
28–34 °C year round with 75–85% afternoon humidity along the coast
Evaporative cooling will not work in Ghana. At 80% humidity there is almost no wet-bulb depression left to use, so a cooler adds moisture to air that is already saturated and the room feels worse, not better. The honest answer here is high-volume air movement: HVLS fans where there is 7 m or more of clear height, and heavy hammer wall exhaust fans to pull heat and moisture out of the building. The harmattan in Tamale and the north brings a few genuinely dry weeks in December and January, but not enough of the year to justify buying coolers.
Tema
Primary destination port
25–35 days
Sea transit from India
10–20days
Production lead time
4terms
EXW · FOB · CIF · CFR
The complete range
All six Ayzair families, supplied to Ghana.
Every product we make is available in Ghana — thirty-four models across six families. They are ordered here by how well each one suits the local climate and the industries that dominate this market, but nothing is off the list.
Industries
Who buys from us in Ghana.
Logistics & compliance
Shipping to Ghana.
| Destination ports | Tema · Takoradi |
| Sea transit | 25–35 days from Nhava Sheva / Mundra, usually with one transhipment |
| Incoterms | EXW · FOB · CIF · CFR |
| Container loading | 40 ft HQ: up to 24 large exhaust fans, model dependent |
| Production lead time | 10–20 working days |
- 230 V / 400 V at 50 Hz matches Ghanaian supply.
- Salt-laden air at Tema and Takoradi is hard on sheet steel. Our galvanized casing and the gravity drop-hammer shutter hold up where motorised louvres seize.
- HVLS fans need 7 m of clear height under the blade to move air across a floor rather than just stirring the roof space. Many Accra light-industrial units are lower than that — send us a section or a photo and we will tell you straight whether HVLS makes sense or whether wall exhaust is the better spend.
Ghana enquiry
Get a proforma invoice for Ghana.
Tell us the models and quantities, or just describe the building and let us size it. You will receive USD pricing, your Incoterm, a container loading plan and a confirmed lead time — within one working day.
Export desk
Answers
Supplying Ghana — common questions
Cannot find what you need? Call +91 80871 10156 or WhatsApp us — an engineer, not a call centre, picks up.
Ask on WhatsAppCan we use evaporative coolers in Tema?
No. Tema humidity sits in the high seventies and eighties most of the year, and an evaporative cooler needs dry air to drop temperature. You would be adding water vapour to saturated air for no useful cooling. Spend the money on exhaust fans and HVLS fans instead.
What does an HVLS fan actually do if it is not cooling the air?
It moves a broad, slow column of air down and outward across the floor, which lifts sweat evaporation off the skin. People report a 4–6 °C equivalent comfort gain while the air temperature itself is unchanged. A 24 ft fan covers roughly 1,000–1,400 m² on 1.5 kW.
Do you supply poultry house ventilation?
Yes. Send shed length, width, eave height and bird count and we will size the exhaust bank, the staging and the inlet area at no charge. This is one of our steadier West African applications.
Nearby markets
Also in Africa
Next step
Shipping to Ghana?
Send your requirement and we will confirm the freight route, transit time, landed cost and whether our products genuinely suit your climate — before you commit.





