East Asia
Selective — see noteIndustrial cooling & ventilation for China
The Pearl River Delta plants around Dongguan, Foshan and Shenzhen, and the Yangtze delta works at Suzhou and Ningbo, run humid summers where moving air and pulling heat out of the roof space is the only honest approach. Dry-air cooling makes sense further inland, at Urumqi, Korla and Baotou, where afternoon humidity drops below 30%. Ayzair ships from Pune into Shanghai, Ningbo-Zhoushan and Shenzhen.
Climate suitability — the honest version
Southern summers at 33–36 °C with 75–85% afternoon humidity; Xinjiang and western Inner Mongolia stay under 30%
China is two different questions. In Guangdong, Fujian and the Yangtze delta, afternoon humidity sits well above 60% through the cooling season and evaporative cooling is simply the wrong product — it adds moisture to air that already has too much. Only the dry northwest, Xinjiang and western Inner Mongolia, is a genuine evaporative case. Everywhere else we lead with air movement and extraction.
Shanghai
Primary destination port
14–20 days
Sea transit from India
10–20days
Production lead time
4terms
EXW · FOB · CIF · CFR
The complete range
All six Ayzair families, supplied to China.
Every product we make is available in China — thirty-four models across six families. They are ordered here by how well each one suits the local climate and the industries that dominate this market, but nothing is off the list.
Industries
Who buys from us in China.
Logistics & compliance
Shipping to China.
| Destination ports | Shanghai · Ningbo-Zhoushan · Shenzhen |
| Sea transit | 14–20 days from Nhava Sheva / Chennai |
| Incoterms | EXW · FOB · CIF · CFR |
| Container loading | 40 ft HQ: up to 24 HVLS fans crated · 20 ft: mixed exhaust fan loads |
| Production lead time | 10–20 working days |
- 220 V single-phase and 380 V three-phase at 50 Hz, which matches our standard build — no rewind needed.
- We will be straight about this: China makes all six of these products at scale and we do not undercut a domestic Chinese manufacturer on price or lead time. The enquiries that make sense are niche sizes we hold and a local supplier does not, replacement units that have to match an existing Ayzair or Indian-built installation, and buyers who want a second source outside their current supply chain.
- HVLS fans need 7 m of clear height under the blade. Many older Chinese workshop buildings are lower than that — send us a section or a roof height before we quote.
- Buyers often need CCC marking for a particular motor class. We do not hold it and will not claim to. We supply the full technical file, test data and motor documentation so your side can run the conformity work.
China enquiry
Get a proforma invoice for China.
Tell us the models and quantities, or just describe the building and let us size it. You will receive USD pricing, your Incoterm, a container loading plan and a confirmed lead time — within one working day.
Export desk
Answers
Supplying China — common questions
Cannot find what you need? Call +91 80871 10156 or WhatsApp us — an engineer, not a call centre, picks up.
Ask on WhatsAppCan you beat a Chinese manufacturer on price?
No. On a standard size in volume, a domestic Chinese manufacturer will be cheaper and faster, and we would rather say so than waste your time. We are worth a quote for sizes that are hard to source locally, for replacement units matching existing Indian-built equipment, and where you want a supply source outside China.
Will evaporative coolers work in our Dongguan plant?
No. Dongguan afternoon humidity runs 75–85% through the hot months. Evaporative cooling needs dry air to work and would only make the floor feel heavier. For that building we would quote HVLS fans for air movement and hammer exhaust fans to clear the roof heat.
Where in China do the duct coolers actually make sense?
Xinjiang, western Inner Mongolia, Gansu and parts of Ningxia. Afternoon humidity there is commonly under 30% and the 18,000–30,000 m³/h ducted units deliver a real temperature drop on 1.5–3 kW.
Nearby markets
Also in East Asia
Next step
Shipping to China?
Send your requirement and we will confirm the freight route, transit time, landed cost and whether our products genuinely suit your climate — before you commit.





